Before
Design hours go to searching every item.
With Beem
We do the searching. Your team decides.
For reviewers
We match every item in the package to your drawings and spec, and our trade experts flag what differs. It's back within 48 hours, and the searching hours go back where they belong: the spaces you're designing and the people who'll use them.
Before
Design hours go to searching every item.
With Beem
We do the searching. Your team decides.
Before
Tired eyes approve the wrong long-lead unit.
With Beem
Differences are flagged before you decide.
Before
Packages sit on desks for weeks.
With Beem
Back to you within 48 hours.
Before
Calls you can't back up when the trades argue.
With Beem
Every flag cites the page it came from.
Product data submittals for
PlumbingLightingElectricalHVAC
How it works
You send


Project manual
Specifications
Divisions 21 to 28
The package, plus your drawings and spec
Beem
We trace each item. Our trade experts flag what differs.
You get back




Differs from the basis of design
Every item traced
The package, ready for your call
Your reviewers open each item with the drawing, the spec and the submitted sheet already side by side and our trade experts' notes below, so the only work left is the decision.
S-002M-005Series fan-powered VAV terminal unit, 8 in. inlet, 625 CFM fan◆needs a lookR&R
Drawing · M601Unit H
1/6 HP1.5 FLA · 277 V
Their sheet · S-002ECM motor table
1/2 HPsmallest listed · 4.1 FLA · 277 V
Trade expert's note“Please confirm the motor before approval.”
1st click
Review each item with the drawing, the spec and the submitted sheet placed side by side, then make the decision: Approved, Approved as noted, Revise and resubmit, or Rejected.
Submittal Reviews
← All jobsDownload comment logJob details
MechanicalPlumbingElectrical
In their package
review-log.csv
at, trade, section, material, name, kind, by, to_gc, flagged, text, org
2nd click
When every item has its decision, download the finalized review log and send it to the responsible parties, without the entire package.
S-002M-005Series fan-powered VAV terminal unit, 8 in. inlet, 625 CFM fan◆✓R&RApproved
Drawing · M601Unit H
1/6 HP1.5 FLA · 277 V
Their sheet · S-002Rev 2 · S-002ECM motor tablemotor corrected
1/2 HP1/6 HPsmallest listed · 4.1 FLA · 277 V1.5 FLA · 277 V · matches M601
Trade expert's note“Please confirm the motor before approval.”
Beem re-check“Rev 2 reads 1/6 HP. Matches the drawing. Nothing else changed.”
S-002 data sheet · Rev 2
resubmitted · read against M601 and the spec
When an item goes back
Still two clicks. The sub sends a corrected sheet, we read Rev 2 against the same drawing and spec, and this motor matches now. The flag clears, and Approved is the same first click, made on one look. If it still differed, it would stay flagged, with the reason.
It's as easy as that!
Material comparison
When the contractor substitutes, you see where the submitted product holds up against what you specified and where it falls short, side by side. You make the call with confidence and can defend it later.
Compare materials
PL10 · Tempering valve WTD-1 · 22 40 00
Basis of design
Maker A TMV-100
Under-sink thermostatic mixing valve
Spec sheet · 2 pages
Submitted
Maker B MV-38
Under-sink thermostatic mixing valve, 2 outlets
Package p. 2 · item S-009
Differs from the basis of design
6 features compared
3 match3 differ
| Feature | Basis of design | Submitted | Result |
|---|---|---|---|
| Listing | ASSE 1070p. 1 | ASME A112.18.1p. 2 | Differs |
| Adjustment range | 80 to 120 °Fp. 1 | 85 to 115 °Fp. 2 | Differs |
| Outlets | 1p. 1 | 2p. 2 | Differs |
| Inlet connections | 3/8 in compressionp. 1 | 3/8 in compressionp. 2 | Matches |
| Minimum flow | 0.25 gpmp. 1 | 0.25 gpmp. 2 | Matches |
| Body | Lead-free brassp. 1 | Lead-free brassp. 2 | Matches |
Key difference
Listing: ASSE 1070 on the basis of design, ASME A112.18.1 on the submitted sheet.
Illustrative products.
When the submitted sheet is the product your documents name, you can clear it and move on.
A different maker or model is flagged, including an alternate where the spec or project manual names the brand.
Every value shows the page it came from, so your decision holds up when the trades argue.
A difference goes into the item's comments as a finished sentence, values and pages included. Send it to the contractor, or keep it internal.
We compare only when a different product came in, so your team isn't reading comparisons it doesn't need.
It shows where the two products part. Whether the substitution is acceptable stays with your reviewer.
Cross-trade check Beta
Each trade's package is reviewed on its own, so a unit that can't run on the circuit feeding it can slip through. We pair the two across the packages and flag both items when we're sure they don't fit.
Mechanical packagefrom the HVAC sub
Electrical packagefrom the electrical sub
Doesn't fit
The rooftop units as submitted are 460 V. The power here is 120/208 V. They won't run.
Both are submitted and don't fit. Ask the designer which one changes.
460 V · their sheet, p. 3120/208 V · panel schedule, E601
ProofIssue note…
Cross-trade note
ToThe designer and the GC's PM coordinator
OnM-02 and E-02, both flagged
Which one changes: the rooftop units at 460 V or Panel H at 120/208 V?
Beta. For now the check covers power: each piece of equipment against the circuit that feeds it. Illustrative job.
Product data for materials and off-the-shelf equipment. We do not cover shop drawings or cut sheets for custom materials that require fabrication.
No. We do the pass before yours, and your reviewers make every determination.
Keep it. We take over the searching, which is where the time goes, and those hours go back to design and your other projects. The transmittal and logs come out of the same issue step you'd do anyway.
Every flag cites the page it came from, so your reviewer checks the source before acting on it.
Software hands you a tool and a setup project. We hand back your project already matched and flagged, for your final decision.
61min
Sample project
The architect's final pass on a 23-item plumbing package, from first click to issued revision.
48hrs
Turnaround
Back to your team within 48 hours of the complete package, so the job doesn't wait on review.
Signed
On the record
When the trades argue, the record answers: who decided what, and the page behind it.
A client's own words go here, after the first pilot.
Forward the contractor's package with your drawings and spec to
It comes back within 48 hours of arriving. Or leave your work email and we'll reach out.
Comment on S-009
Listing: the basis of design, Maker A TMV-100, is listed to ASSE 1070 (spec sheet p. 1). The submitted Maker B MV-38 lists ASME A112.18.1 (package p. 2).