Submittal packages, done for you

Skip the search and the resubmittal.

We search out every item you have to submit and the cut sheet for each one, then check every sheet against your drawings and spec. You fix what differs before the reviewer sees it, and the package is back to you in days.

Before

Long-lead items waiting on paper.

With Beem

Packages out early, material released on time.

Before

Items your estimate missed, and you're still on the hook for them.

With Beem

Every item listed up front, while there's still time to price the gap.

Before

Nights and weekends building packages.

With Beem

We build the package. You make the calls.

Before

Rejections that restart the clock.

With Beem

Each answer cites its page for the reviewer.

Product data submittals for

PlumbingLightingElectricalHVAC

The clock starts at approval.

Long-lead items can't be released until the submittal is approved. Every week a package sits comes off the back of the schedule.

  1. 01Package sentDays with Beem
  2. 02ApprovedThe clock starts
  3. 03Material releasedLead time
  4. 04DeliveredOn site
  5. 05InstalledThe crew works

Send it early, and the lead time runs while the job still has room.

The common enemy

Nobody wins a resubmittal.

Every round trip starts with a miss: a requirement buried in a schedule note, or a sheet for the wrong model. Someone has to find it, and the later it turns up, the more it costs everyone on the job.

Without Beem

  1. Package goes out
  2. Waits its turn
  3. Someone searches every page
  4. The miss turns up
  5. Revise and resubmit

Every resubmittal starts the clock over

With Beem

  1. Every item matched before it goes out
  2. Differences flagged for the reviewer
  3. The call, made on the first pass
  4. Material moves

How it works

Two looks before it leaves your desk.

You send

Drawings and spec book

Beem

We find every item and check each option against the spec.

You get back

A package ready for your calls

What you get

Find it at submittal, while it's still a fix.

The submittal is the first time your material list meets the drawings line by line. Anything your estimate missed is still yours to supply, and finding it here leaves time to raise it before it comes out of your margin.

Every item accounted for

Every schedule row is reconciled against the drawings and spec, and what's missing gets flagged instead of dropped.

Options that can be approved

The basis of design, plus the alternate brands the spec allows when you want a choice, each with a checked data sheet.

A match when the sheet is missing

When the basis-of-design sheet isn't available, we attach the closest match from our library and flag it for you.

Answers with sources

Each answer cites the page it came from, so the package answers the reviewer before they ask.

Closeout submittals

When the job's complete, download the finalized closeout submittals and send them off, each maker's warranty document already in the set.

Your files stay yours

Your drawings and packages belong to you, and you can take them with you.

What it means for your firm.

On time

Project managers

Early packages protect the back end of the schedule, and your crew isn't left waiting on material.

Margin

Owners

You front the material. Catching the wrong product at submittal keeps it from becoming a change order or a restocking fee.

Next bid

Business development

GCs keep a call-first list. A clean submittal is a reference for the next job.

Questions subcontractors ask

Do you pick the product?

No. We line up what the spec allows and check it. You choose the brand and the model, and you mark the sheet.

A subcontractor's own words go here, after the first package.
Placeholder Name, role and company of a client who signs off on the quote

Send one package.

Send the job's drawings and spec book to

hello@beembuild.com

It's back in days. Or leave your work email and we'll reach out.

Your documents stay yours. We use your drawings and spec book to build your package. Ask for them back, or ask us to delete them, at any point.